I-95 ETL NORTHBOUND MD 43 to MD 152

Clearwater Construction provided caisson drilling, rock socketed h-piles, and anchored soldier pile and lagging walls.

The project consisted of shafts from 24” through 60” diameter. Caissons were in soil and/or rock at 7 structures. Most rock drilling utilized air powered cluster drilling equipment to drill into a very high strength Gabbro rock formation.

PROJECT DETAILS

Client:
Allan Myers MD, Inc.
Location:
Baltimore + Hartford Counties, MD
Contract Value:
$1.8 Million